Download PDFOpen PDF in browserAssessment of Solar Rooftop Power Plant-a Case StudyEasyChair Preprint 32643 pages•Date: April 26, 2020AbstractIn this project, We are doing the assessment of the rooftop solar power plant that is present in our college rooftop, that is KIET group of institutions has established 100 kWp capacity grid-connected solar photovoltaic power plant on the rooftop of the E-block, KIET Muradnagar campus, Ghaziabad . The plant was fully commissioned on 2 August 2016. With the motive of green campus, management of KIET group of institutions is looking forward for installation of Solar Power Plant with larger capacity to cater complete KIET campus. Hence, it is essential to document the performance of the first grid-connected solar power plant installed in KIET. In this report, the performance of the photovoltaic solar power plant in KIET during 1June 2017 to 16 June 2018 has been discussed. Keyphrases: Solar, assessment, power plant, rooftop
|